Computational source/receiver built and measured — 2026-10-18

The owner selected computational reference first. DC-M4 — Chemical/Kinetic Computational Reference: Built and Measured now records a reproduced independent published closed chemical model and a separately declared new reciprocal mechanical extension. Six cases/two steps and independent review pass: coupled length1→0.97638 with positive receiver loading, while no-coupling/no-chemistry controls remain unloaded. Draft PR53, exact head bc44dbac88b0754ae53f030d0852f462468ce3af, CI39127154714 PASS.

This closes the bounded computational build/measurement milestone. Physical apparatus remains unbuilt; complete target physical/native calibration stays unqualified and four production values null. Published full-state chemistry and the new operational maps do not silently replace this page’s earlier constant-battery/native-kinetic boundaries.

Status

PARTIAL / CONDITIONAL REFERENCE MAPS ESTABLISHED / FULL CALIBRATION BLOCKED

Authority and scope

Owner authorizes establishing a justified reference after confirming that no specific reference previously existed. Directive DC-M4-CALIBRATION-REFERENCE-MAPPING-001 starts from 004d7f6c775b5adf2a092cde33d42c349b8f4cee. Follows DC-M4 — Independent Calibration-Source Admission and Evidence Acquisition. No production integration or numerical parameter assignment is authorized or performed.

Selected reference roles

Toyabe2010 is selected as an independent experimental work/heat/chemical-affinity comparator, not as an established identity for Digital Cell. Its rotary work port admits the exact local chart q = r × angle and force = torque / r, with radians and independently specified positive r. No physical edge lever arm, ATP=A or catalytic-state=polarity identity is asserted. Primary manuscript.

A proposed controllable two-port Hookean fixture is defined as the operational mechanical reference contract. It is unbuilt and unmeasured; spring constant, gearing and physical scales remain unspecified. Independent applied-force/deformation metrology would be required. NIST method reference. The acquired Albaugh motor remains contrasting independent computational evidence, with no target calibration admission.

Exact conditional mapping

For one fixed P and L0, let u = sL × (L−L0), v = sa × a and U = kref × (u−v)² / 2. With independently established positive energy scale e, reference energy U = e × Ec exactly if kref × sL² = e × K × P / L0² and sa/sL = lambda × L0/P. Target efforts and work equal the mapped reference efforts and work divided by e; e remains unspecified. Both displacement ports carry work; externally commanded v-work is not fuel work by declaration. A single fixed fixture does not implement the multi-P acquisition design. A separately characterized fixture family or explicit fixed-P scope is required.

The complete positive-scale dictionary distinguishes length, time, polarity amount, fuel amount and energy. It preserves force–distance and conversion-affinity–amount work, finite conversion-sector ledgers, reaction-rate scaling and dimensionless groups. This is a unit transformation within a shared model, not proof of external equivalence. Native ks has force units; normalization does not identify dimensionless coefficients.

Decision-changing obstructions

An independent binary-state spring population contains an additional variance energy proportional to x(1−x). It can match mechanical force while disagreeing on conversion affinity. A closed ideal fuel mixture has affinity that decreases with depletion; an exact constant-epsilon_A map over positive depletion is unavailable. A local approximation has explicit derivative and integrated error bounds but needs independent composition, temperature, activities and a presealed error budget.

The acquired open motor has reservoirs, distinct blocker states and source-specific standard states; its processed current/cycle summaries do not recover the target joint spring, conversion affinity or finite fuel ledger. These are scoped incompatibilities, not a general impossibility proof.

Remaining calibration requirements

All four production parameters K, lambda, theta and epsilon_A remain null. Zero target observations are admitted. Physical species/amount and SI scales, independently characterized two-port data, finite-source affinity, kinetic theta, uncertainty and holdout/source-admission evidence remain missing. The reaction-architecture gap is narrower but open. No fitting, acquired-code execution, native modification, R13 correction or automatic successor.

Verification and preservation

Distinct seven-file review accepts conditional reference/unit/work mappings only. All11 focused tests and25 deterministic helper cases pass; independent parent controls cover64 joint energy/work cases,136 direct binary-element sums and202 finite-source slope-bound samples. Full calibration remains PARTIAL/BLOCKED; no observations admitted and four production values null.