Status

DEFINED / INDEPENDENTLY VERIFIED / ACCEPTED CONTRACT ONLY / PARAMETERS UNASSIGNED

Authority and scope

Owner-authorized DC-M4-CONVERSION-WORK-OWNERSHIP-CONTRACT-001 starts from b2de15dc0d7a7ee3f25b7993c558099d17a150a0. This defines one proposed physical ownership contract after DC-M4 — Local Reaction Architecture Feasibility Gate. It does not implement feedback or establish a biological correction.

Concrete candidate

Existing active/inactive polarity amounts and mature edge geometry determine an additional derived elastic energy. Conversion has a signed energy derivative and the same energy supplies a reciprocal mechanical force and exact discrete work relation. A driven bidirectional kinetic tilt uses that derivative; it is explicitly phenomenological, without a local-detailed-balance claim.

Positive energy changes require additional finite existing A, separately from unchanged native costs. Conversion/work spending enters W; synthesis A enters polarity material. Negative energy changes never replenish A. Transport and topology track local energy fragments, preventing unrelated downhill changes from subsidizing an uphill change. Initialization, maturation, rupture, restart and fission ownership are explicit and fail closed.

Qualification limits

K, lambda, theta and epsilon_A remain unassigned positive constitutive parameters. No parameter search, production Rust, mechanics, ecology, fission or checkpoint implementation changed. The declared mechanical terminal/bath allocation, solver feasibility, calibration, runtime execution and total legacy thermodynamics remain unverified. DC-M4-R13 — Geometry-to-Polarity Intra-Operator Causal Decomposition Gate remains accepted reaction-mediated damping in thirty states, uncorrected. R4 remains production reference; R10 diagnostic-only. No automatic successor.

Evidence and custody

Isolated checkout /home/sketch/Projects/digital_cell-conversion-work-contract; local evidence /home/sketch/Projects/digital_cell-conversion-work-contract-evidence/. The mounted Atlas UUID 840ca6b3-5d4f-41fc-9dac-21355e045a6d is verified; final source/review/CI/readback receipts will be stored additively under the Digital Cell evidence archive. Existing work and PR44/45/46 are preserved.

Verified publication — 2026-10-17

Exact head a007e7e08acc768f08b83d96139a7cea25f0e04e; draft PR47; CI 39073964178 PASS. Downloaded artifact 12115804083, ZIP sha256:6346eeeb9721eae9c4ab9d448ea130d5ecc04a5636b74832572eb8aadfbd805c. All 32/32 repository manifest bindings and 16/16 frozen scientific source bindings verify against the exact head. Hosted verification JSON reproduces the local exact-head result byte for byte; manifests match semantically.

Distinct independent review is ACCEPTED_CONTRACT_ONLY, hash-bound to five reviewed files. Parent execution passes 192 exact rational finite conversion/discrete-work cases and 18 control groups, including finite fragment funding, noncollinear geometry work and rejection of cross-edge energy netting. These are diagnostic reference arithmetic and provenance checks, not runtime lifecycle or rollback verification. Historical global governance failures are unchanged from entry; targeted new records pass.

Six prior local checkouts and PR44/45/46 retain their heads, bases and existing work. Scientific production source is byte-identical. Evidence custody root: /srv/ATLAS/100_ACTIVE/Projects/DIGITAL_CELL/evidence/conversion-work-contract/; local originals remain at /home/sketch/Projects/digital_cell-conversion-work-contract-evidence/. Publication, archive preservation and final Notion readback receipts are retained there outside Git to avoid self-referential commit hashes.

Next boundary

The proposed specification is closed conditionally. A separately authorized prospective parameter and mechanical-work-port feasibility specification is needed before implementation. The port/bath allocation within composite mechanics and solver/contact feasibility remain open; no feedback correction or automatic successor is claimed.

Atlas custody seal — 2026-10-17

Direct verification on Atlas confirms the expected UUID and bind, the additive publication-a007e7e/ delivery of 159 files, all delivery hashes, hosted ZIP integrity and 32/32 internal manifest bindings. All 206 pre-existing reaction-feasibility archive files remain hash-identical. Original Atlas source, six earlier local checkouts and PR44/45/46 are preserved. Receipt: /srv/ATLAS/100_ACTIVE/Projects/DIGITAL_CELL/evidence/conversion-work-contract/archive-verification-a007e7e.json; local duplicate retained. No previous archive file was replaced or deleted.

Prospective feasibility specification completed — 2026-10-17